Operations – FWE Western Energy https://fwe-services.com Mon, 04 May 2026 13:00:56 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.3 FAT Successfully Completed for the Procurement and Installation of Two (2) HP Gas Compressors and a Vapour Recovery Unit (VRU), Including the Integration of Existing Facilities at OML 152 https://fwe-services.com/rt-portfolios/factory-acceptance-test-fat-successfully-completed-for-oml-152-gas-development-project/ Wed, 22 Apr 2026 12:53:50 +0000 https://fwe-services.com/?post_type=rt-portfolios&p=12263

FAT Successfully Completed for the Procurement and Installation of Two (2) HP Gas Compressors and a Vapour Recovery Unit (VRU), Including the Integration of Existing Facilities at OML 152

Project Information
Clients:
Newcross Petroleum Limited
Category:
Factory Acceptance Test
Project Location:
Houston
Project Brief

We are pleased to announce the successful completion of the Factory Acceptance Test (FAT) for the project “Procurement and Installation of Two (2) HP Gas Compressors and a Vapour Recovery Unit (VRU), including the Integration of Existing Facilities at OML 152.”

Newcross Petroleum Limited, the operator of OML 152, is executing this strategic project with FWE Western Energy Ltd as the contractor. The project is aimed at optimizing gas production, minimizing flaring, and maximizing asset value through the deployment of two (2) HP Gas Compressors, a Vapour Recovery Unit (VRU), and supporting infrastructure.

As part of this milestone, representatives from FWE Western Energy Ltd, Newcross Petroleum Limited, Nigerian Upstream Petroleum Regulatory Commission, and Nigerian Upstream Investment Management Services carried out a joint visit to the OEM facility at Enerflex Ltd. in Houston, where the FAT was conducted to validate that all equipment meets the required design and operational specifications.

The Factory Acceptance Test covered both the HP Gas Compressors and the Vapour Recovery Unit (VRU), with the following activities successfully completed:

    Visual inspection carried out on the two (2) HP Gas Compressors.
    Successful testing and verification of the Murphy control panel functionality.
    Loop testing was completed across all instrumentation on both compressors and the VRU system.
    Full FAT execution performed on both HP Compressors, including startup and shutdown using all Safety Instrumented System (SIS) controls.
    VRU compressor FAT successfully conducted, including performance evaluation at varying operating speeds (RPM).
    Staged run programmes executed (5, 10, 15, and 30 minutes), with monitoring of bearing and journal temperatures, all confirmed to be within acceptable limits.
    Testing of critical safety devices, including pressure switches, temperature sensors, vibration switches, and emergency shutdown systems on both CAT and compressor panels - all verified to be functioning effectively.
    Identification and verification of all instruments installed on the VRU skid.
    Comprehensive walkthrough of Piping & Instrumentation Diagrams (P&ID) and Process Flow Diagrams (PFD), ensuring alignment with the physical installation across compressor and VRU skids (with final validation nearing completion).
    All operational parameters were recorded, reviewed, and formally signed off.

This milestone represents a significant step forward in the delivery of critical gas infrastructure for OML 152, reinforcing commitment to operational excellence, environmental sustainability, and efficient resource utilization.
The project now progresses toward the next phase, shipment and site integration.

]]>
Engineering, Procurement, Installation and Commissioning for JISIKE Associated Gas Compressor Station https://fwe-services.com/rt-portfolios/engineering-procurement-installation-and-commissioning-for-jisike-associated-gas-compressor-station/ Wed, 19 Nov 2025 09:15:36 +0000 https://fwe-services.com/?post_type=rt-portfolios&p=12093

Engineering, Procurement, Installation and Commissioning for JISIKE Associated Gas Compressor Station

Project Information
Clients:
Seplat Energy PLC
Category:
Procurement, Installation and Commissioning
Complete Date:
2024
Project Location:
Jisike Field
Project Brief

FWE Western Energy is currently engaged in the SEPLAT Jisike EPIC Contract, providing full support through the Engineering, Procurement, Installation, and Commissioning phases of the project. The scope covers the delivery of essential equipment, materials, technical services, and field support required for SEPLAT’s operations within the Jisike field.

As part of this contract, we are responsible for coordinating all procurement activities, managing certified suppliers, overseeing logistics and inspection, and ensuring that all project materials meet SEPLAT’s strict quality and safety standards. Our team also provides installation support, technical documentation, and compliance reporting throughout the execution period.

This project highlights our capability to deliver reliable, high-quality solutions within the Nigerian oil and gas sector. Through strong project management, strict adherence to industry standards, and full alignment with Nigerian Content requirements, we continue to support SEPLAT’s operational goals and contribute to safe, efficient, and sustainable field development.

]]>
Provision of Overhaul Ariel Compressor in WA https://fwe-services.com/rt-portfolios/provision-of-overhaul-ariel-compressor-in-wa/ Wed, 19 Nov 2025 08:20:54 +0000 https://fwe-services.com/?post_type=rt-portfolios&p=12070

Provision of Overhaul Ariel Compressors in Western Assets (WA) Locations

Project Information
Clients:
Seplat Energy PLC
Category:
Maintenance
Complete Date:
2024
Project Location:
WA Locations
Project Brief

FWE Western Energy Limited successfully executed the overhaul of Ariel reciprocating gas compressors across multiple Western Asset (WA) facilities for Seplat Energy Limited. These compressors play a major role in gas handling and production continuity, making reliability a critical requirement for day-to-day operations.

Our scope included providing skilled technical personnel, specialized tools, and all necessary support to safely disassemble, inspect, service, and reassemble the compressor units in line with Ariel OEM standards. Key activities covered the inspection of major components, replacement of worn parts, alignment checks, torqueing to specification, safety device testing, and support during start-up procedures.

Through this work, we restored each compressor to optimal performance, improved system reliability, and supported seamless production across the facilities. The project was completed safely, on schedule, and in full compliance with the client’s maintenance and operational procedures.