Design, Procurement, Installation and Commissioning of a LACT Unit for OML 147 and The Decommissioning of the existing OML 147 LACT Unit at Ogharefe Flow Station

Project Information
Clients:
PAN OCEAN
Category:
Procurement
Complete Date:
2024 - On Going
Project Location:
Ogharefe Flow Station
Project Brief

FWE Western Energy Limited is currently executing the design, procurement, installation, and commissioning of a new Lease Automatic Custody Transfer (LACT) unit for Pan Ocean Oil Corporation’s OML 147 From 2024 – Till Date. The project also included the safe decommissioning and removal of the existing LACT unit at the Ogharefe Flow Station. We covered end-to-end project delivery, including detailed engineering design, equipment sourcing, fabrication, construction, testing, and system commissioning to achieve optimal metering accuracy and reliability. FWE ensured that all activities were carried out in compliance with Pan Ocean’s operational standards, industry best practices, and regulatory safety requirements.

Below are the works done in Pan Ocean

Stringing, Fit-Up and Welding Of 6” Line Pipes from The LACT Unit to The Valve Pit
Stringing, Fit-Up and Welding Of 6” Line Pipes from The LACT Unit to The Valve Pit
Fit-Up and Welding of The Fabricated Piping Spools
Fit-Up and Welding of The Fabricated Piping Spools
Manual Excavation and Probing Of 10” Discharge Lines of The Tanks
Thrust Boring Activities on Road Crossing